The people I was with and I had to wait awhile for the new parts to arrive

I work for a supplier that handles more than 2 different class and ceramic products.

The glass and ceramic products are shaped, sanded, and packaged in our shop, when the glass and ceramic products are shaped, a lot of dust and debris is released into the air.

I am thankful that this locale has a fantastic air filtration system. I have worked in a couple of other factories and this 1 has the best air filtration system by far, even when I am in the glass splitting room, there is barely any dust or debris in the air. The air filtration component has a special air filter right by the unit and that cuts down on any extra matter, but last month there was a problem with the air filtration system and the shop was shut down for more than 2 days while both of us waited for the new parts to arrive. It was the first time that the shop ever had to shut down due to a problem with malfunctioning equipment. Usually the electrical engineer or mechanical engineer on duty can handle this type of issue, however the parts had to be ordered from the manufacturer this time. I didn’t suppose if my boss was going to pay anyone for the more than 2 days both of us missed, so I was happily surprised when I got my paycheck on Thursday and it was exactly the same as a numerous-day work week. I spent the more than 2 days off going to the beach and surfing, and getting paid for those more than 2 days was just icing on the cake. When I went back to work, I felt rejuvenated and totally energized.

 

Heating technician